Development type: Industrial
Location: Reserved
Usable area: 500 m2
Year: 2017
Team: GDA
Below is an excerpt from a multi-disciplinary design study for a modern paint shop with an area of approx. 500 m² in an existing hall with an area of 20,000 m². Reconstruction of the production hall (construction of a foundation trench for technological equipment and mechanical ventilation systems) along with a change in the use of the warehouse part of the hall into a process washing facility, industrial wastewater treatment plant, and liquid paint shop. Commissioned by PROJEKTER.

